0

What are project metric

posted on , by Akshay Mishra

Project Management Metrics #1: Schedule and Effort/Cost VarianceThe goal of this metric is to measure the performance as well as progress of the project against signed baselines.  This metric is very important and is the base for profitability of project. The EVM (Earned Value Management) concept, as defined by PMI standard PMBOK, is the commonly used method to track this metric. It ...

0

Different Level of CMM

posted on , by Akshay Mishra

Level One :Initial - The software process is characterized as inconsistent, and occasionally even chaotic. Defined processes and standard practices that exist are abandoned during a crisis. Success of the organization majorly depends on an individual effort, talent, and heroics. The heroes eventually move on to other organizations taking their wealth of knowledge or lessons learnt with them.Level Two: Repeatable - This level of Software Development Organization has a basic and consistent ...

0

Test Cases of Web Pages - LAB 10

posted on , by Akshay Mishra

We have to generate the test cases for the above web page. Normally there are two types of testing. They are i)                   White Box Testingii)                Black Box TestingBlack Box Testing            In black box testing can help to get the design and coding correct ...

0

SRS of Railway Reservation System

posted on , by Akshay Mishra

Software Requirement Specification for Railway Reservation System            The SRS for Railway Reservation System is given as follows:Introduction ·        Purpose·        Scope·        Definition·        Product ...